EGR 107 Introduction to Engineering Design - Spring 2008
Overall Toothpick Bridge Project Winning Team

Instructor: Dr. Jeng-Nan Juang (ECE)
EGR 107.003 Team G
Muhammad Ally (BME), Andrew Hall (MAE), Larney Abdush-Shakur (ECE)
Bridge Weight 16.8 g, Failure Load 12.98 kg, Efficiency 772.62 g/g
Allow movie time to load. Scenes will advance automatically, or you can
click on the thumbnails on the bottom if you wish to view specific photos.